New version of the brutalist lantern in XXL size. Suspension made of metal dipped in a 24-carat yellow gold bath, allowing soft light to filter through thanks to the rock crystal. An exceptional piece.
The standard production lead time is estimated at 12 to 16 weeks. This piece can also be custom-made, with a manufacturing time between 20 and 24 weeks.